New Retractable Roof almost done on BC Place (twin to Min Stadium)

Arctic Dawgs

Well-Known Member
Looks like the roof will be done in May

When everything’s finished, the roof fabric will take about 20 minutes to open or close above the field area. All 56,500 seats will remain covered.


Read more: Tour of B.C. Place reveals tricks and trades behind $500m cable-supported roof

The old fabric roof collapsed last year. Pretty sure I read somewhere a while ago that this stadium is a twin to Minnisotas. It is undergoing a total refit. Engineering is already done and specs are ready if Minny decides to fix theirs
 
Back
Top